[ad_1]



The property builder verified it was closing the plant final thirty day period as part of an ongoing rethink of its offsite approach.
Earlier this year Countryside confirmed a critique of its offsite functions which experienced remaining the organization with excessive capability and forecast running losses of £10m.

The Bardon manufacturing facility only opened final Autumn producing modular panels and Countryside was just one of the industry’s earliest adopters of MMC with an primary goal of offering 6,000 residences a year by 2025 employing offsite procedures.
The Bardon site is now staying marketed for sale by chartered surveyor Walker Singleton.
The product sales brochure states: “The overall plant is a point out of the art panel production line, installed in 2020/2021, enabling the manufacture of shut panel timber frames, embracing modern-day procedures of building.

“Walker Singleton have been instructed to invite curiosity in the total Homag/ Weinmann closed panel timber body panel line, along with the Dodd Engineering floor cassette line.
Countryside is preparing the entire organization for a sale and it at this time has two other offsite factories.






[ad_2]
Source connection